Order promising is best defined as:
A) time between recognition of the need for an order and the acknowledged,genuine receipt of goods.
B) sales department commitments for delivery.As such,it answers the question "when can you ship?"
C) lists of all of subassemblies,parts,and raw materials that go into a parent assembly.As such,it shows the quantities required.
D) separating locations where end-items are built from locations of warehouses where subassemblies are stored.
Correct Answer:
Verified
Q46: New product introductions are most likely to
Q47: MRPII is the foundation for Enterprise Resource
Q48: Once the MPS is accepted and authorized,the
Q49: MRP reflects the systems viewpoint by connecting
Q50: Based on systems thinking,changes to any part
Q52: MRP assumptions include:
A)demand is dependent.
B)demand is independent.
C)demand
Q53: OPP assumptions include:
A)demand is independent.
B)demand is discontinuous.
C)demand
Q54: MRPII operates at the lowest level of
Q55: Master production schedules are partially driven by
A)sales
Q56: The MPS stage needs to be fully
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents