MRP assumptions include:
A) demand is dependent.
B) demand is independent.
C) demand is sporadic and lumpy.
D) both a and c
E) both b and c
Correct Answer:
Verified
Q47: MRPII is the foundation for Enterprise Resource
Q48: Once the MPS is accepted and authorized,the
Q49: MRP reflects the systems viewpoint by connecting
Q50: Based on systems thinking,changes to any part
Q51: Order promising is best defined as:
A)time between
Q53: OPP assumptions include:
A)demand is independent.
B)demand is discontinuous.
C)demand
Q54: MRPII operates at the lowest level of
Q55: Master production schedules are partially driven by
A)sales
Q56: The MPS stage needs to be fully
Q57: Transformation of MRPII to ERP in its
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents