Match the letter in the project control chart shown in the figure with the corresponding item in the following.
-Historical information: Data base for future projects
Correct Answer:
Verified
Q82: Final as-built drawings are submitted to????
A) Give
Q83: When compared to other delivery method options,
Q84: What is a punch list?
A) A card
Q85: Match the letter in the project control
Q86: Match the letter in the project control
Q88: Match the letter in the project control
Q89: Match the letter in the project control
Q90: Match the type of schedule listed with
Q91: Match the type of schedule listed with
Q92: Match the type of schedule listed