Final as-built drawings are submitted to????
A) Give the architect more work
B) Keep records for later maintenance
C) Prepare for later renovations or additions
D) Both B & C
Correct Answer:
Verified
Q77: Which of the following would be considered
Q78: A construction network schedule shows????
A) The order
Q79: Which curve listed would best serve as
Q80: A cash flow analysis utilizes information
Q81: In a Design/Bid/Build arrangement, a (an) ????contract
Q83: When compared to other delivery method options,
Q84: What is a punch list?
A) A card
Q85: Match the letter in the project control
Q86: Match the letter in the project control
Q87: Match the letter in the project control