An approach to accelerate a project by simply eliminating discretionary dependencies is called:
A) Crashing
B) Concurrent engineering
C) Critical chain scheduling
D) Fast tracking
E) PERT/CPM
Correct Answer:
Verified
Q9: A project cannot have more than one
Q10: Contingencies should be built in at the
Q11: The following type of buffer does not
Q12: The following buffer enables the project manager
Q13: Resource buffers are always placed:
A) on the
Q15: GERT (circle all that are true):
A) utilizes
Q16: Statement: PERT requires three time estimates for
Q17: Statement: Given the assumptions of PERT, it
Q18: Statement: In PERT, the mean (expected) time
Q19: Statement: Although the times used in PERT