If a line is balanced with 80-percent efficiency,the "balance delay" would be
A) 20 percent.
B) 80 percent.
C) 100 percent.
D) depends on the next operation.
Correct Answer:
Verified
Q4: What is takt time?
A)Time between placement and
Q13: Cellular manufacturing systems (choose two)
A)are usually U-shaped
Q22: U-shaped production lines that are more efficient
Q28: In Muther's grid the Symbol "X" represents
Q29: The cycle time in a production line
Q33: Use the information below to answer the
Q36: The benefits of flexible manufacturing systems (FMS)include
A)reduced
Q36: The minimum possible cycle time in a
Q37: A production manager wants to design an
Q39: In a process map,the diamond symbol indicates
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents