The minimum possible cycle time in a production line is determined by the
A) longest task time.
B) shortest task time.
C) average task time.
D) total task time.
Correct Answer:
Verified
Q31: The model used in designing functional layouts
Q32: A schematic picture of a process using
Q33: Use the information below to answer the
Q34: The process of allocating tasks to process
Q35: In Muther's grid the Symbol "I" represents
A)Absolutely
Q37: A production manager wants to design an
Q38: In a fixed position layout,the workstation stays
Q39: In a process map,the diamond symbol indicates
Q40: In a process map,the diamond symbol indicates
Q41: Goods that use similar technologies that can
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents