An engineer changed the TCP Power Threshold for a wireless deployment from the default value to -65 dBm. The engineer conducts a new post deployment survey to validate the results. What is the expected outcome?
A) decreased channel overlap
B) increased cell size
C) increased received sensitivity
D) decreased client signal strength
Correct Answer:
Verified
Q2: An engineer performs a Layer 1 survey by
Q3: An engineer has performed a predictive site
Q4: Q5: An engineer is designing a wireless network Q6: During a post deployment site survey, issues Q7: An engineer must decide the cell overlap Q8: A network administrator of a global organization Q9: An engineer is performing a predictive wireless Q10: A network engineer is preparing for an Q11: A customer is concerned about mesh backhaul
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents