Some failures have potentially serious consequences, but if the probability of the incident is low, then
A) The risk may not warrant immediate action
B) The risk may warrant immediate action
C) The risk may warrant appropriate mitigation action
Correct Answer:
Verified
Q99: Coordinated activities to direct and control an
Q100: When equipment has low deterioration rates as
Q101: The primary product of a RBI effort
Q102: Is a risk management activity that may
Q103: Potential hazards identified in a PHA will
Q105: Following are the non-inspection mitigation actions except
Q106: A RBI analysis shares many of the
Q107: Hazard identification in a RBI analysis generally
Q108: Following are some of the recognized risks
Q109: Risk presented in quantitative risk analysis as