The ____ of the building is calculated by multiplying the area of the building by the height from the bottom of the gravel under the basement slab-on-grade to the top of the roof surface.
A) area
B) coverage
C) volume
D) mass
Correct Answer:
Verified
Q1: The_ method is the most sophisticated preliminary
Q2: The assembly method of estimating is less
Q3: Single-rate methods are generally accurate and can
Q4: The typical bay method is more flexible
Q5: _ estimation methods include price per typical
Q7: Preliminary estimating methods can be used to
Q8: Estimators typically turn to preliminary estimating methods
Q9: Using the price per unit estimating method
Q10: With the _ method of estimating, a
Q11: Assembly estimating can be a powerful cost