The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are in control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results
Using .95 control limits (5 percent risk of Type I error) , which instructor(s) , if any, should he conclude is (are) out of control?
A) none
B) Prof. B
C) Prof. D
D) both Prof. B and Prof. D
E) all
Correct Answer:
Verified
Q92: A quality analyst wants to construct a
Q93: A quality analyst wants to construct a
Q94: A quality analyst wants to construct a
Q95: The chair of the operations management department
Q96: A quality analyst wants to construct a
Q98: A quality analyst wants to construct a
Q99: A quality analyst wants to construct a
Q100: The chair of the operations management department
Q101: The basis for a statistical process control
Q102: The approaches to quality assurance are
A)process inspection,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents