A quality analyst wants to construct a sample mean chart for controlling a packaging process. He knows from past experience that whenever this process is in control, package weight is normally distributed with a mean of 20 ounces and a standard deviation of two ounces. Each day last week, he randomly selected four packages and weighed each
If he uses upper and lower control limits of 22 and 18 ounces, what is his risk (alpha) of concluding this process is out of control when it is actually in control (Type I error) ?
A) 0.0026
B) 0.0456
C) 0.3174
D) 0.6826
E) 0.9544
Correct Answer:
Verified
Q94: A quality analyst wants to construct a
Q95: The chair of the operations management department
Q96: A quality analyst wants to construct a
Q97: The chair of the operations management department
Q98: A quality analyst wants to construct a
Q100: The chair of the operations management department
Q101: The basis for a statistical process control
Q102: The approaches to quality assurance are
A)process inspection,
Q103: When a process is in control, it
Q104: A quality analyst wants to construct a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents