Which of the following statements regarding PERT times is TRUE?
A) The optimistic time estimate is usually the same as the most likely time estimate.
B) The optimistic time estimate is an estimate of the maximum time an activity will require.
C) The expected time estimate is calculated as t = (a + 4m + b) /6.
D) The pessimistic time estimate is an estimate of the minimum time an activity will require.
E) The most likely time estimate is an estimate of the maximum time an activity will require.
Correct Answer:
Verified
Q81: The beta distribution is used in project
Q82: The expected activity time in PERT analysis
Q83: Analysis of a PERT problem shows the
Q84: A project being analyzed by PERT has
Q85: A contractor's project being analyzed by PERT
Q87: A project being analyzed by PERT has
Q88: An activity on a PERT network has
Q89: The _ distribution is used by PERT
Q90: In a PERT network, non-critical activities that
Q91: The bell curve is often appropriate for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents