Five jobs are waiting for processing through two work centers. Their processing time (in minutes) at each work center is contained in the table below. Each job requires work center Sigma before work center Delta. According to Johnson's rule, what sequence of jobs will minimize the completion time for all jobs?
A) R-S-T-U-V
B) V-S-U-T-R
C) S-U-T-V-R
D) V-R-U-S-T
E) R-T-V-S-U
Correct Answer:
Verified
Q56: Machines A, B, C, and D have
Q57: Earliest due date is a shop floor
Q58: The president of a consulting firm wants
Q59: What is input-output control?
Q60: Three jobs are to be assigned to
Q62: Five welding jobs are waiting to be
Q63: EDD stands for what?
A) earliest due date
B)
Q64: Average completion time for a schedule sequence
Q65: Eight jobs have been sequenced at a
Q66: What does the use of the shortest
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents