Solved

Quality Control Charts Usually Have a Central Line and Upper

Question 48

Multiple Choice

Quality control charts usually have a central line and upper and lower control limit lines. Which of the following is not a reason that the process being monitored with the chart should be investigated?


A) A large number of plots are close to the upper or lower control lines.
B) The behavior of the plots is erratic.
C) A single point falls above or below the control limits.
D) There is a change in raw materials or operators.
E) There is a run of five above the central line.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents