Quality control charts usually have a central line and upper and lower control limit lines. Which of the following is not a reason that the process being monitored with the chart should be investigated?
A) A large number of plots are close to the upper or lower control lines.
B) The behavior of the plots is erratic.
C) A single point falls above or below the control limits.
D) There is a change in raw materials or operators.
E) There is a run of five above the central line.
Correct Answer:
Verified
Q43: If there are 12 total defects from
Q44: You want to develop a three-sigma R-chart.
Q45: You are going to develop an R-chart
Q46: You are going to develop an X-bar
Q47: Quality control charts usually have a central
Q49: For which of the following should we
Q50: For which of the following should we
Q51: You are developing an X-bar chart based
Q52: You want to determine the upper control
Q53: You want to develop a three-sigma R-chart.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents