In an MRP problem, A is an MPS item. Every A requires 2 B's and 3 C's. Every B requires 5 C's. All lead times are two periods. Initial inventory value for A is 100, B is 200, and C is 0. Use lot-4-lot method for order quantities for all items. If gross requirement for A is 800 in period 9, what will be the planned-order release for B in period 5?
A) 1,600
B) 1,400
C) 700
D) 800
E) 1,200
Correct Answer:
Verified
Q80: Which of the following is an input
Q81: If annual demand is 6,125 units, annual
Q82: In an MRP problem, A is an
Q83: Which of the following is not a
Q84: Which of the following is a dynamic
Q86: Which of the following is a dynamic
Q87: In an MRP problem, A is an
Q88: Under the lot-for-lot (L4L) lot-sizing technique as
Q89: If annual demand is 12,000 units, annual
Q90: Which of the following is a dynamic
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents