Having __________ manufacturing flexibility is desirable.
A) Increased
B) Decreased
C) Both increased and decreased
D) Neither increased nor decreased
Correct Answer:
Verified
Q23: A solid line in a material flow
Q24: If a bottleneck process has a processing
Q25: DBR stands for?
A) Drum, Buffer, Regular
B) Drum,
Q26: The last step in DBR production scheduling
Q27: Identifying and improving constrained processes is the
Q29: The scheduling of work releases to a
Q30: Material flow analysis can help to answer
Q31: Procedure and behavioral constraints include all of
Q32: Evaluating a process for effectiveness, quality, and
Q33: Inventory held downstream of the bottleneck process