The scheduling of work releases to a system is referred to as the?
A) Drum
B) Buffer
C) Rope
D) Neither the drum, buffer, nor the rope
Correct Answer:
Verified
Q24: If a bottleneck process has a processing
Q25: DBR stands for?
A) Drum, Buffer, Regular
B) Drum,
Q26: The last step in DBR production scheduling
Q27: Identifying and improving constrained processes is the
Q28: Having _ manufacturing flexibility is desirable.
A) Increased
B)
Q30: Material flow analysis can help to answer
Q31: Procedure and behavioral constraints include all of
Q32: Evaluating a process for effectiveness, quality, and
Q33: Inventory held downstream of the bottleneck process
Q34: In an organization, something that keeps the