A large drilling machine is being built to dig a tunnel under a river. The drilling machine will be very big and is unlikely to be used after this project. It is being built close to the project site on the river bank. Which of the following ways of organizing a process should be used to produce the drilling machine?
A) Product layout
B) Process layout
C) Fixed position layout
D) Cellular layout
Correct Answer:
Verified
Q96: Ricardo has made a conscious effort to
Q97: ISO 14000 is a new computer training
Q98: _ is concerned with all of the
Q99: Susan works in a small manufacturing firm
Q100: In operations management, _ refers to completing
Q102: When the vice president of operations for
Q103: Which of the following statements best illustrates
Q104: _ are stocks of goods or other
Q105: A(n) _ is a set of related
Q106: _ hold inventories of raw materials, components
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents