In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 50 per hour, the safety stock is 20% of the demand during lead time, the container size is 4.If the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed?
A) 60
B) 80
C) 90
D) 120
E) 150
Correct Answer:
Verified
Q47: In the textbook, Toyota's Fujio Cho identified
Q53: You have been called in as a
Q56: In setting up a Kanban control system
Q59: You have been called in as a
Q60: Which of the following is related to
Q61: Which of the following is not listed
Q62: Imagine comparing a manufacturing operation using regular
Q68: Which of the following is an element
Q71: In a lean production system, we expect
Q75: Group technology (GT) is credited with which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents