In setting up a Kanban control system you need to determine the number of Kanban card sets needed.If the expected demand during lead time is 25 per hour, the safety stock is 20% of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what is the number of Kanban card sets needed?
A) 5
B) 20
C) 27
D) 30
E) 34
Correct Answer:
Verified
Q22: A kaizen burst is an overfilled kanban
Q47: In the textbook, Toyota's Fujio Cho identified
Q51: To implement lean production schedules a firm
Q53: You have been called in as a
Q58: In setting up a Kanban control system
Q59: You have been called in as a
Q60: Which of the following is related to
Q61: Which of the following is not listed
Q68: Which of the following is an element
Q75: Group technology (GT) is credited with which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents