The estimation of activities' durations using some type of mathematical process is called:
A) mathematical estimating.
B) psychometric estimating.
C) econometric estimating.
D) parametric estimating.
Correct Answer:
Verified
Q25: Inputs into the activity resource estimating process
Q26: _ is a technique that is
Q27: _ use a process of evaluating
Q28: Resources:
A)affect both the time and the cost
Q29: _ is a technique used to
Q31: _ is an analysis used to
Q32: _ is the process of estimating
Q33: Resource allocation:
A)plays a large role in determining
Q34: The longest path through a network diagram
Q35: The process of determining start and finish