Question 61
Essay
How do GCs generally obtain information on upcoming construction projects that they could bid for?
Question 62
Essay
Of the four project delivery methods, which delivery method is most popular at the present time, as described in the text?
Question 63
Essay
What is the essential difference between a change order and a modification of contract? Explain.
Question 64
Essay
Explain the benefits of the GC's preconstruction services. In which project delivery methods are GC's preconstruction services available?
Question 65
Essay
Sketch in three dimensions the hypothetical building given in the text, which may be used to recollect the first 10 divisions of the MasterFormat. Then, list these 10 divisions.
Question 66
Essay
Provide the spelled- out versions of the acronyms "CMAA" and "CMAR." Then, explain the differences between the two project delivery methods. Use sketches to illustrate the contractual relationships between various parties involved in both methods.
Question 67
Essay
List the important items contained in a project manual. At what stage are addenda and contract modifications added to the document that will finally become the project manual?
Question 68
Essay
Explain what integrated project delivery is and how it differs from the other methods of project delivery.
Question 69
Essay
Using a sketch, explain the difference among construction documents, bidding documents, and contract documents.
Question 70
Essay
Of the four project delivery methods, which delivery method is least popular at the present time, as described in the text?
Question 71
Essay
Using a diagram, show the contractual relationships among the owner, architect, consultants, GC, and the subcontractors in a conventional (design- bid- build)building project.
Question 72
Essay
Using a sketch, explain what fast- track scheduling is, and then, list its advantages and disadvantages.
Question 73
Essay
Name an additional benefit of the tower- mounted web- based camera(s)on a construction site, other than providing 24Γ7 imagery of the construction progress.
Question 74
Essay
Explain the purposes of the three surety bonds used in a typical building project, and the stages at which they are provided.
Question 75
Essay
Which design documentation technology allows the detection of clashes between building components during the design stage? Does this technology reduce the amount of time spent on sketch design (SD)and design development (DD)stages of the project?
Question 76
Short Answer
Explain the difference between change orders and contract modifications.
Question 77
Essay
What are shop drawings, why are they required, and for which items? Who prepares them, and do they require any approval? If so, by whom? Explain.
Question 78
Essay
Name at least three items of construction for which shop drawings are generally required.
Question 79
Essay
List the phases into which the work on a building project is divided, including the three subdivisions (stages)of the design phase. Then, briefly explain what is accomplished in each stage.