Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element if the worker is rated at 80%?
A) Less than 23 seconds
B) Greater than or equal to 23 seconds but less than 26 seconds
C) Greater than or equal to 26 seconds but less than 29 seconds
D) Greater than or equal to 29 seconds
Correct Answer:
Verified
Q15: Timing the work elements using the snap-back
Q25: The continuous method of timing work elements
A)
Q26: Which of these drawbacks would be considered
Q28: Traditional work measurement techniques often are viewed
Q29: Garman observes a worker assembling peanut
Q31: A manager is interested in setting a
Q33: Keith assembles peanut valves and the
Q34: When using a time-study approach,the standard time
Q38: An analyst using a time study approach:
A)
Q93: Which one of the following statements about
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents