Garman observes a worker assembling peanut valves and records the data displayed in the table.What is the select time for this job element if the worker is rated at 80%?
A) 15 seconds
B) 20 seconds
C) 25 seconds
D) 30 seconds
Correct Answer:
Verified
Q25: The continuous method of timing work elements
A)
Q26: Which of these drawbacks would be considered
Q28: Traditional work measurement techniques often are viewed
Q30: Garman observes a worker assembling peanut
Q31: A manager is interested in setting a
Q33: Keith assembles peanut valves and the
Q34: When using a time-study approach,the standard time
Q38: An analyst using a time study approach:
A)
Q89: An advantage of the elemental standard data
Q93: Which one of the following statements about