Five jobs are waiting for processing through two work centres. Their processing time (in minutes) at each work centre is contained in the table below. Each job requires work centre Sigma before work centre Delta. According to Johnson's rule, what sequence of jobs will minimize the completion time for all jobs?
A) R-S-T-U-V
B) S-V-T-R-U
C) S-U-T-V-R
D) V-R-U-S-T
E) none of the above
Correct Answer:
Verified
Q61: Use of the shortest processing time sequencing
Q63: Which of the following dispatching rules is
Q70: Five jobs are waiting for processing
Q71: The priority rule that sequences jobs using
Q71: Five jobs are waiting to be
Q72: When a set of jobs must pass
Q75: Five welding jobs are waiting to
Q76: Which critical ratio value implies that a
Q78: Flow time represents the time
A) an order
Q79: Five jobs are waiting for processing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents