Which of these statements regarding time-cost tradeoffs in CPM networks is true?
A) Crashing is not possible unless there are multiple critical paths.
B) Crashing a project often reduces the length of long-duration, but noncritical, activities.
C) Activities not on the critical path can never be on the critical path, even after crashing.
D) Crashing shortens the project duration by assigning more resources to one or more of the critical tasks.
E) None of the above are true.
Correct Answer:
Verified
Q61: A local project being analyzed by PERT
Q63: A project whose critical path has an
Q69: If an activity whose normal duration is
Q71: If an activity whose normal duration is
Q73: An activity on a PERT network has
Q75: An activity on a PERT network has
Q76: A project being analyzed by PERT has
Q97: Contract requirements state that a project must
Q97: _ is a network technique using only
Q125: A network has been crashed to the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents