The description of an activity in a network diagram usually starts with a ____.
A) verb
B) noun
C) name of the individual responsible
D) length of the estimated duration
Correct Answer:
Verified
Q110: Each activity in a network diagram is
Q111: Activities should _ the time intervals at
Q112: Arrows linking the activity boxes in a
Q113: In preparing a network diagram, drawing activities
Q114: Designating _ as having primary responsibility can
Q116: _ in a network diagram will allow
Q117: A change in responsibility, that is, a
Q118: Each box for an activity in a
Q119: A _ shows their appropriate sequence and
Q120: Activities in a network diagram have _,