A Quality Analyst wants to construct a sample mean chart for controlling a packaging process.He knows from past experience that whenever this process is under control,package weight is normally distributed with a mean of twenty ounces and a standard deviation of two ounces.Each day last week,he randomly selected four packages and weighed each with the following results: If he uses upper and lower control limits of 23 and 17 ounces,on what day(s) ,if any,does this process appear to be out of control?
A) Monday
B) Tuesday
C) Monday and Tuesday
D) Monday,Tuesday,and Thursday
E) The process is in control
Correct Answer:
Verified
Q76: The DMAIC methodology involves all EXCEPT which
Q77: The probability of concluding that an assignable
Q78: For which of the following would a
Q79: When a process is judged out of
Q80: A shift in the process mean for
Q82: For a process to be capable,it must
Q83: What should managers have in place if
Q84: A Quality Analyst wants to construct a
Q85: A Quality Analyst wants to construct a
Q86: A design engineer wants to construct a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents