Periodic updating of an MRP system to account for all changes which have occurred within a given time interval is called:
A) pegging.
B) planned order releases.
C) net-change MRP.
D) regenerative MRP.
E) exception report.
Correct Answer:
Verified
Q41: Independent demand tends to be _,while dependent
Q42: A process designed to handle purchasing and
Q43: The MRP approach that immediately updates only
Q44: In MRP,"scheduled receipts" are:
A)identical to "planned-order receipts."
B)identical
Q45: The input used in MRP that lists
Q47: Which of the following are not primary
Q48: In MRP,under lot-for-lot ordering,the size of "planned-order
Q49: The gross requirements of a given part
Q50: Which one of the following is not
Q51: Ignoring the possibility of safety stock requirements,which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents