Bottlenecks occur at work centres when the idle time is equal to zero.
Correct Answer:
Verified
Q17: Input/Output (I/O)control is a visual representation of
Q18: Input/output (I/O)control refers to monitoring changes in
Q19: All priority rules are designed to ensure
Q20: A Gantt chart is a specialized scheduling
Q21: Shop-floor control,or production activity control,involves the execution
Q23: The primary limitation of the first come,first
Q24: For the Theory of Constraints,the transfer batch
Q25: A basic difference between staff scheduling in
Q26: For a one machine/station shop,the shortest (imminent)processing
Q27: The output of the system is limited