Input/Output (I/O)control is a visual representation of the progress of jobs that indicates if they are ahead or behind schedule.
Correct Answer:
Verified
Q12: In the production planning hierarchy,scheduling is the
Q13: First come,first served (FCFS)is an example of
Q14: Scheduling work centre loading must be completed
Q16: Loading refers to the assignment of jobs
Q18: Input/output (I/O)control refers to monitoring changes in
Q19: All priority rules are designed to ensure
Q20: A Gantt chart is a specialized scheduling
Q21: Shop-floor control,or production activity control,involves the execution
Q22: Bottlenecks occur at work centres when the
Q39: Makespan is the total time needed to