A load Gantt chart only designates the total load for work centres not the timing of jobs.
Correct Answer:
Verified
Q5: Backward scheduling is based on working back
Q6: In job scheduling,most loading of work centres
Q7: A Gantt chart is a visual aid
Q8: Priority rules generally assume that a job's
Q9: The term loading,as used in scheduling,refers to
Q11: Sequencing is concerned with the order in
Q12: In the production planning hierarchy,scheduling is the
Q13: First come,first served (FCFS)is an example of
Q14: Scheduling work centre loading must be completed
Q39: Makespan is the total time needed to