A line-balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass,Inc.The desired output rate of 30 spreaders per hour will be achieved.The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled.This is the total productive time.Which of the following statements must be true?
A) The cycle time is 30 seconds per spreader.
B) The theoretical minimum number of stations is 10.
C) If the solution calls for 11 stations,the efficiency is 80%.
D) If the solution calls for 12 stations,the efficiency is 80%.
Correct Answer:
Verified
Q108: Table 7.14
The production of a particular product
Q109: Table 7.9
Balance the following line for an
Q110: Figure 7.1 Q111: Table 7.11 Q112: An assembly line has to perform 10 Q114: Table 7.9 Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents
The Pennsylvania Appliance Company is installing
Balance the following line for an