Lean systems try to:
A) produce a product in anticipation of demand.
B) maximize the value added by of each of its activities.
C) organize production in large lots to minimize the number of setups.
D) reduce the labor content in all processes.
Correct Answer:
Verified
Q1: Regarding the Eight Types of Waste that
Q11: What did the production manager say to
Q14: Regarding the Eight Types of Waste that
Q42: A method in which production of an
Q43: There are many requirements for the successful
Q48: The lean system concept will not work
Q50: Using customer demand to activate production of
Q59: The goal of single-digit setups is to
Q68: Regarding the Eight Types of Waste that
Q153: Lean systems do not need stable master
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents