A kanban system requires little variability in lead time because shortages have their impact on the entire productive system.
Correct Answer:
Verified
Q1: Which of the following is specifically characterized
Q3: The 5Ss-sort/segregate, simplify/straighten, shine/sweep, standardize, and sustain/self-discipline-are
Q33: The Toyota Production System requires that activities
Q36: What does TPS stand for?
A) Total Production
Q39: Which of the following isnot a reason
Q41: The list of 5S's, although it looks
Q42: Which one of the following is a
Q49: Level scheduling means producing at a constant
Q57: With level schedules, a few large batches,
Q113: Because most services cannot be inventoried, there