Line balancing is constrained by precedence requirements and cycle time restrictions.
Correct Answer:
Verified
Q25: A flexible manufacturing system (FMS)combines flexibility with
Q26: With a product layout the purpose of
Q27: The desired cycle time refers to the
Q28: The maximum amount of time a product
Q29: The balance delay is calculated by subtracting
Q31: Precedence requirements reflect physical restrictions on the
Q32: Cellular layouts reduce transit time and increase
Q33: A schematic diagram using weighted lines to
Q34: Which of the following is not a
Q35: Most service facilities utilize fixed-position layouts.