In lean production,waste is defined as
A) overproduction.
B) high levels of inventory.
C) unnecessary movement.
D) All of the answer choices are correct.
Correct Answer:
Verified
Q53: The pace at which production should take
Q54: All of the following factors pressure companies
Q55: In a pull system reducing the number
Q56: _ setups can be performed in advance
Q57: Lower inventory levels make processes
A)less dependent on
Q59: How many kanbans should circulate between two
Q60: A workstation's output is 200 bottles of
Q61: Which of the following are characteristic of
Q62: American workers implementing lean prefer
A)the slow pace
Q63: The most prevalent applications of lean include
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents