For production control,lean pull systems are best suited for:
A) Repetitive manufacturing
B) Job shop production
C) Semi-repetitive batch manufacturing
D) None of the above
Correct Answer:
Verified
Q2: If a manufacturer has daily requirements for
Q2: External setup time refers to:
A)The time it
Q3: How many cycles are required each day
Q4: Which of the following is not an
Q6: According to the lean philosophy,it is required
Q7: The time it takes a container to
Q8: Reduction of setup time is accomplished by
Q9: The principal objective of a lean system
Q28: Value stream maps are similar to flowcharts
Q37: External setups refer to actions that require