A firm has prepared the following binary integer program to evaluate a number of potential locations for new warehouses. The firm's goal is to maximize the net present value of their decision while not spending more than their currently available capital.
Max 20x1 + 30x2 + 10x3 + 15x4
s.t. 5x1 + 7x2 + 12x3 + 11x4 ? 21 {Constraint 1}
X1 + x2 + x3 + x4 ? 2 {Constraint 2}
X1 + x2 ? 1 {Constraint 3}
X1 + x3 ? 1 {Constraint 4}
X2 = x4 {Constraint 5}
Which of the constraints ensures that at least two of the potential sites will be selected?
A) Constraint 1
B) Constraint 2
C) Constraint 3
D) Constraint 4
E) Constraint 5
Correct Answer:
Verified
Q16: The Excel sensitivity report can be used
Q17: A parameter analysis report can be used
Q18: It is possible to have a constraint
Q19: A BIP problem considers one yes-or-no decision
Q20: BIP can be used to determine the
Q22: In a BIP problem, 1 corresponds to
Q23: In a BIP problem, 1 corresponds to
Q24: Binary variables can have the following values:
A)
Q25: A firm has prepared the following
Q26: If a firm wishes to choose at
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents