The production manager for the Coory soft drink company is considering the production of two kinds of soft drinks: regular and diet. Two of her limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of the ingredients) , limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. Which of the following is not a feasible production combination?
A) 90R and 75D
B) 135R and 0D
C) 75R and 90D
D) 40R and 100D
Correct Answer:
Verified
Q79: Decision variables
A) measure the objective function.
B) measure
Q80: A company producing a standard line
Q81: An intern sets up a linear program
Q82: Cully Turniture buys two products for resale:
Q83: Which of these statements is best?
A) An
Q85: The production manager for the Coory soft
Q86: The _ property of linear programming models
Q87: In the formulation of a ≥ constraint,
A)
Q88: Cully Furniture buys two products for resale:
Q89: Which of the following is not a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents