The early start for a non-critical activity is always equal to the earliest finish of the preceding activity.
Correct Answer:
Verified
Q24: The earliest finish time for the final
Q25: Two concurrent activities in a project can
Q26: Project _ is a method for shortening
Q27: Three time estimates (optimistic, most likely, and
Q30: The early start for an activity on
Q31: Shortening the project's duration by deleting unnecessary
Q32: The early start of an activity that
Q33: An AON network will never require dummy
Q55: In PERT, the path with the fewest
Q69: The standard deviation of project duration is