In PERT, three time estimates (optimistic, most likely, and pessimistic) provide an estimate of the mean and variance for each activity, based on the normal distribution.
Correct Answer:
Verified
Q3: In PERT, the expected project completion time
Q4: An element of project planning is to
Q5: In PERT, the project variance is the
Q6: A work breakdown structure breaks down a
Q7: Slack is the amount of time an
Q9: One aspect of project control is team
Q10: Project crashing is a method for shortening
Q11: Project teams are made up of individuals
Q12: A statement of work is a written
Q13: Making time estimates is an element of