Which of the Following Statements About the Use of Control

Question 47

Multiple Choice

Which of the following statements about the use of control charts is/are FALSE?


A) The one point outside the control limits on the Which of the following statements about the use of control charts is/are FALSE? A) The one point outside the control limits on the   chart is effective for detecting a gradual shift in the process mean. B) To provide a quicker alarm when the process has gone out of control we can look for other patterns on the   chart,such as by adding a runs rule. C) A pattern such as nine consecutive points,either above the center line or below the center line,can be used as a signal that a process has been disturbed by a special cause. D) When additional patterns are looked for on a control chart,the false alarm rate,when the process is in control,will increase. E) A false alarm occurs on a control chart when a plotted point gives an out-of-control signal,but the process is operating only with common cause variability. chart is effective for detecting a gradual shift in the process mean.
B) To provide a quicker alarm when the process has gone out of control we can look for other patterns on the Which of the following statements about the use of control charts is/are FALSE? A) The one point outside the control limits on the   chart is effective for detecting a gradual shift in the process mean. B) To provide a quicker alarm when the process has gone out of control we can look for other patterns on the   chart,such as by adding a runs rule. C) A pattern such as nine consecutive points,either above the center line or below the center line,can be used as a signal that a process has been disturbed by a special cause. D) When additional patterns are looked for on a control chart,the false alarm rate,when the process is in control,will increase. E) A false alarm occurs on a control chart when a plotted point gives an out-of-control signal,but the process is operating only with common cause variability. chart,such as by adding a runs rule.
C) A pattern such as nine consecutive points,either above the center line or below the center line,can be used as a signal that a process has been disturbed by a special cause.
D) When additional patterns are looked for on a control chart,the false alarm rate,when the process is in control,will increase.
E) A false alarm occurs on a control chart when a plotted point gives an out-of-control signal,but the process is operating only with common cause variability.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents