The MRP list,unlike the stock/requirements list,highlights changes to MRP elements that have occurred since MRP was executed.
Correct Answer:
Verified
Q97: MPS is a mandatory step in the
Q98: When using planning without final assembly,components are
Q99: The input to MRP is the independent
Q100: A product group groups products with similar
Q101: The lot size calculation step in MRP
Q103: MPS creates planned orders for the MPS
Q104: SOP can be either flexible or standard.
Q105: The schedule lines control parameter applies to
Q106: A processing key is a control parameter
Q107: Net requirements calculation is one of the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents