MRP type specifies
A) Whether the material is produced in house or is obtained externally.
B) How material quantities for planning will be calculated.
C) The production control technique used in planning.
D) The available time periods the ERP system can use for scheduling.
E) The strategy for BOM selection.
Correct Answer:
Verified
Q41: Setup time,processing time,and interoperation time are elements
Q42: Requirements that are calculated based on actual
Q43: Which of the following options represents categories
Q44: What is SOP used for?
A)Creating an operational
Q45: Setup time is the time required to
A)Set
Q47: The planning table is best defined as
A)An
Q48: Replenishment lead time is
A)The time between placing
Q49: Consider the following scenario,then choose which one
Q50: The MRP technique calculates the requirements for
Q51: The lot size key specifies the
A)Optimum lot
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents