Which of the following is an advantage of developing a predetermined overhead application rate?
A) Long-run fluctuations in volume of output are eliminated.
B) In a job order system,unit costs can be determined only at the end of the period.
C) The overhead application rate facilitates assigning overhead costs to the ending inventory of work in process.
D) Actual overhead will always be less than applied overhead.
Correct Answer:
Verified
Q24: Which of the following is a characteristic
Q25: The method used by managers when comparing
Q26: The two steps required in activity-based costing
Q27: If the manufacturing overhead account at month
Q28: A job order cost system would be
Q30: A debit balance in the Manufacturing Overhead
Q31: The advantage of using a predetermined overhead
Q32: In activity-based costing,only one cost driver should
Q33: Under a job order cost system,costs are
Q34: Activity-based costing tracks cost to the activities
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents