Which of the following statements is correct concerning the elements of cycle time?
A) Move time is the time spent moving (1) raw materials from storage to production and (2) goods in process from one factory location to another factory location.
B) Inspection time is the time spent producing the product.
C) Process time is considered non-value-added time.
D) Wait time is considered value-added time.
E) Cycle efficiency is the ratio of non-value-added time to total cycle time.
Correct Answer:
Verified
Q134: The following is a partially completed lower
Q135: Division X makes a part with the
Q136: The Dark Chocolate Division of Yummy Snacks,Inc.had
Q137: Division M makes a part that it
Q140: Pleasant Hills Properties is developing a golf
Q141: The investment center return on investment is
Q174: A company rents a small building with
Q185: With respect to cycle time, companies strive
Q193: A_ accumulates and reports costs and expenses
Q196: A _ helps control costs and expenses
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents