Over the years (as shown by Fredrick Brook's book "The Mythical Man Month"),research has shown that creating and following standards has actually led to late projects,so the experts advise keeping standards to a minimum and allowing flexibility as that will give additional employee satisfaction and faster development.
Correct Answer:
Verified
Q23: Which of the following is NOT a
Q34: If the system being analyzed,designed and developed
Q37: This particular type of documentation control lists
Q48: Adding new requirements to a project after
Q50: If a mismatch exists between available programming
Q56: This type of documentation describe how to
Q58: The main difference between alpha testing and
Q60: An example of a fairly recent enhancement
Q62: Mya is a programmer on the new
Q65: Even if there were flaws in the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents