Acceptable risk of assessing control risk too low is the risk that the auditor is willing to take in accepting a control as effective when the true population exception rate is greater than the estimated population exception rate.
Correct Answer:
Verified
Q81: The acceptable risk of assessing control risk
Q85: Which of the following results in a
Q88: Whenever auditors use sampling, they risk making
Q89: ARACR is normally lower for a public
Q90: If the result obtained from a particular
Q91: Explain the effect on sample size of
Q96: The difference between the tolerable exception rate
Q98: The conjoined sample exception rate is the
Q122: Tolerable exception rate (TER) is inversely related
Q123: You are determining the appropriate sample size
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents